
Underlying Program Goals:
// lead students in HANDS-ON construction combined with a design studio education in order to discover new intersections between design and fabrication.
// foster a COLLABORATIVE studio environment such that students engage more fully in a dialogue with their peers, practitioners, context and communities.
// implement architecture, design and the making of space to catalyze POSITIVE SOCIAL CHANGE and stewardship of our built environment.
March 28, 2009
March 26, 2009
sewing machine update
by an unforeseen turn of events (reading the manual), the necchi machine is back in commission. i'll drop it off at the studio on saturday for anyone who's anxious to get some sewing done!
March 25, 2009
with two sewing machines down..
..hopefully they'll get us back on our feet:
http://singersewandvac.com/contactus.htm
worst case scenario, we come out with a new machine this weekend. wish megan and i luck!
in the meantime, we've got two presentations to prep for:
BAC alley w/BBNA - Wed 4/1
UNLR - Thurs 4/2
with megan & ben leading the BBNA charge, who can lead assembling the boards for roxbury? we should plan to present them initial concepts and site strategies, with the intent to bring full scale prototypes to Dream Day, Sat. 4/11.
http://singersewandvac.com/contactus.htm
worst case scenario, we come out with a new machine this weekend. wish megan and i luck!
in the meantime, we've got two presentations to prep for:
BAC alley w/BBNA - Wed 4/1
UNLR - Thurs 4/2
with megan & ben leading the BBNA charge, who can lead assembling the boards for roxbury? we should plan to present them initial concepts and site strategies, with the intent to bring full scale prototypes to Dream Day, Sat. 4/11.
March 18, 2009
Schedule/Deadline Updates
(tonight) March 18th> With this DD Deadline, We need to meet until we resolve things to a good degree. I'd say expect to stick around until about 10pm if you can swing it. We will also pass out self evaluations and instructor evaluations to be turned in this coming Saturday to Charles.
March 21st>, Charles and Pax will be leading the class, and ideally we'll be sewing and cutting and ordering things at that point. We need a joint effort to make Saturday our first productive BUILD day.
March 25th> We will have a three hour class, with no scheduled meeting on the following Saturday. However, we will have quite a bit of work to do, and it is advised that the design leads manage the work that weekend for our upcoming deadlines....
Upcoming Deadlines:
March 21st>, Charles and Pax will be leading the class, and ideally we'll be sewing and cutting and ordering things at that point. We need a joint effort to make Saturday our first productive BUILD day.
March 25th> We will have a three hour class, with no scheduled meeting on the following Saturday. However, we will have quite a bit of work to do, and it is advised that the design leads manage the work that weekend for our upcoming deadlines....
Upcoming Deadlines:
- April 1st 6pm - Presentation to BBNA of Green Alley/Green Roof/ UdB Canopy.
- April 2nd - UNLR Meeting in Roxbury to address dream day and show our work informally
- April 11th - Dream Day in Roxbury
hardware sourcing
March 16, 2009
March 11, 2009
Structural Precedents
http://www.ocean-designresearch.net/index.php?option=com_content&view=section&id=14&Itemid=120
http://www.membranespaces.net/?page_id=313
http://www.membranespaces.net/?page_id=29
http://www.membranespaces.net/?attachment_id=244
http://www.membranespaces.net/?page_id=233
http://www.membranespaces.net/?attachment_id=110
http://www.membranespaces.net/?attachment_id=163
Notice the depth and complexity that is inherent to these cable net systems. Additionally, I think we need some variation in the membrane sizes.
http://www.memb
http://www.memb
http://www.memb
http://www.memb
http://www.memb
http://www.memb
Notice the depth and complexity that is inherent to these cable net systems. Additionally, I think we need some variation in the membrane sizes.
Subscribe to:
Posts (Atom)

Nomadic Canopies, mock-up session - Spring '09

Frederick Douglass Peace Park Amphitheater, rendering - Spring'08