i'll meet y'all at the studio at noon to help andrew and becca load up sandwiches and eqpt to take to the site.
our plan is to cut formwork walls from the 3/4" stock on site and affix ply-sandwiches, caulking joints. also, we'll test mockup for the buttress, esp. how to secure to the ground
12p--4:30p, based on building hours. would someone volunteer to store equipment (two bags, power tools) for the night to extend our work hours?
lunch is provided
Underlying Program Goals:
// lead students in HANDS-ON construction combined with a design studio education in order to discover new intersections between design and fabrication.
// foster a COLLABORATIVE studio environment such that students engage more fully in a dialogue with their peers, practitioners, context and communities.
// implement architecture, design and the making of space to catalyze POSITIVE SOCIAL CHANGE and stewardship of our built environment.
May 10, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment