Wes, thanks for the calcs- i see where i screwed up here. I want to change the 'bench slab' back to your original 6" (i misunderstood and thought you were referring to the stage slab). Also, the piles calculation is correct based on the column table on the website. so we have in total:
Stage slab: 1.12 cubic yards
(6) Bench piles: .48 cubic yards
Bench Caps @ 10" average: 3.53 cubic yards
Bench Slabs: (.705 + .88 + .54) 2.125 cubic yards
Bench Bases: 2.461 cubic yards
TOTAL cubic yards required:
9.716
10 cubic yards total, should we make it an odd 11 for fun?