wed.28
1.01 Lisa will be fabricating stencils for the memory concrete at the BAC
1.02 6:30pm Wes to visit site and confirm post location/collar sizes
thurs.29 - 6:30pm [becca, charles, janine, andrew confirmed]
2.01 Sew/Grommet Canopies. Reinforce corners and Bias tape
2.02 Complete one + canopy and take away to be brought to site
sat.31 - 11am - 6pm [kyle, charles confirmed]
3.01 Kyle to pick up ply strips and blocking from BAC/materials prior to site
3.02 Site Work:attach sandwiches to BenchC, install runners/plumb
BenchA, install pipe security line for Bench B. Confirm boxcrate completion.
sun.01 - 12am -6pm [kyle, charles confirmed]
4.01 Kyle to pick up all remaining materials at the BAC before 5pm
4.02 Site Work: Install pipe line in Bench B and C, Level bench C, Attach
cleats throughout. Calculate additional plywood required.
action items:
5.01 Wes - post detail drawings and coordination with John by friday morning
5.02 Andrew/Lisa to develop formwork drawings for stage slab
5.03 All- bring volunteers!
to purchase:
liquid nail for forms
rent pasload nailer for Sunday
please confirm your availability for the weekend/other thoughts by commenting below!
Underlying Program Goals:
// lead students in HANDS-ON construction combined with a design studio education in order to discover new intersections between design and fabrication.
// foster a COLLABORATIVE studio environment such that students engage more fully in a dialogue with their peers, practitioners, context and communities.
// implement architecture, design and the making of space to catalyze POSITIVE SOCIAL CHANGE and stewardship of our built environment.